Traffic on the Podilsko-Voskresenskyi Bridge is open

In just a few months, Autostrada has completed plans to complete one of the country's longest and most famous long-term construction projects.
For now, only special vehicles, public transport and emergency vehicles will be able to use the bridge.
The first phase of the Podilsko-Voskresenskyi Bridge Crossing will provide traffic in both directions between the right and left banks of the Dnipro River - from Podil to Rusanivski Gardens.
In this short period of time, Autostrada employees have built the approaches from Rusanivski Sady, constructed retaining walls, a drainage system, insulated concrete surfaces on the bridge structure, installed lighting poles, paved the roadway, sidewalks and bicycle paths, installed railings, barrier fencing and noise screens.